Refurbishment ยท Across the UK

Refurbishment that keeps the building working

Smart building retrofit, office refurbishment and change of use, coordinated from planning and design through contractors, snagging and handover. Because we also manage buildings, we plan every project around how it will run afterwards.

One accountable route Online programme tracking FM handover built in
Programme viewIllustrative, not live data
  • Site photos uploaded: strip-out complete
  • Risk logged and assigned an owner
  • Stage gate approved by the client
  • Progress report issued

Shows how the Refurbishment Portal presents a project. Not a real project.

Smart building retrofit

Bring an existing building up to date

We upgrade existing buildings with modern controls, sensors and building systems. Works are coordinated around the people using the building, and planned so the upgraded systems can be run and maintained properly afterwards.

  • Survey of the existing systems and how the building is used
  • Specialist design input where the upgrade needs it
  • Works phased to keep the building in use
  • Handover into planned maintenance under our hard FM service

Hard FM after handover

Building systemsIllustrative examples
  • Heating and cooling controlsExistingUpgradingConnected
  • Lighting controlsExistingUpgradingConnected
  • Occupancy sensorsExistingUpgradingConnected
  • VentilationExistingUpgradingConnected
  • MeteringExistingUpgradingConnected
  • Access controlExistingUpgradingConnected
Example systems only. Scope is agreed for each building.

Project types

Projects we coordinate

Separate from day-to-day FM, with the same accountable way of working: one route across planning, design, contractors, construction and handover.

Smart building retrofit

Upgrading existing buildings with modern controls, sensors and building systems.

Office refurbishment

Workplace upgrades planned around occupiers, so disruption to the business is kept to a minimum.

Change of use

Coordinating projects that convert a building to a new use, from early planning to handover.

How a project runs

From first idea to a building that runs well

A single accountable path from concept through delivery, reducing fragmented communication between owners, designers and contractors.

  1. 1

    Planning

    Project intent, building use, constraints, programme and the decisions needed before work starts.

  2. 2

    Design

    Design input coordinated so building operation, occupier experience and feasibility are considered early.

  3. 3

    Structural coordination

    Suitable structural and technical specialists brought in where building changes need professional input.

  4. 4

    Project management

    Programme, communication, decision tracking and issue control throughout.

  5. 5

    Contractor coordination

    Tender support, attendance, progress chasing, site communication and evidence of completion.

  6. 6

    Construction delivery

    Practical coordination of the works on site.

  7. 7

    Snagging and handover

    Defects listed, put right and checked before the building is handed back.

  8. 8

    FM handover

    Facilities management thinking applied after completion, so the improved building is easier to operate.

projects.homoon.co.ukIllustrative
  • Programme
  • Progress
  • Site photos
  • Risks
  • Documents
  • Reports
Design
Works
Handover

Refurbishment Portal

Follow your project online

Clients can follow their refurbishment or change-of-use project in the Refurbishment Portal.

  • Programme tracking and progress updates
  • Site photos, risks, gates and documents
  • Client reporting

Homoon will never ask for your portal password by email. Always sign in from our portals page or by typing the portal address yourself.

Planning works?

Tell us about the building and what you want to change

Share the property type, its current condition and the intended use, and we will suggest a practical next step.